Please follow the prompts during operation:
1. Put the line and transport board in place. The upper and lower dual lines of board thickness respectively pop up on the axis of the installed wallboard. Position the boards of the required number along the dual lines.
2. Saw the boards. Cut the boards with a handheld cutting machine according to the desired sizes.
3. Sizing. Apply the special adhesive into the concave-convex grooves of the wallboard and into the baseline of the floor, to ensure full and even mortise mortar.
4. Erect the boards. Erect the wallboards at the predetermined position.
5. Install the boards in the proper places. Abut on the wallboards forcefully, to extrude the mortar from the joints, to ensure fullness of the mortar, and then temporarily fix them with wedge.
6. Correction and fixing. Pry them with a crowbar from the bottom for adjusting and correction; check the verticality and flatness with a guiding rule, and then insert a Φ6 or Φ8 steel bar of about 15cm long with an inclined angle to fix the board.
7. Grouting and supplying slurry. Fill up the corrected wall with a special adhesive; smooth and fill up the upper and lower seams; take out the wedges after the adhesive is dry and hard.
8. Slotting and pre-burying pipelines. Slot and pre-bury pipelines and switch boxes with a handheld cutting machine; after installation, level it with a special adhesive.
9. Cloth sticking (mesh or anti-crack tapes). Wait for three to five days after the wall installation until the adhesive becomes dry and shrank, and then attach a 50mm wide mesh or anti-crack tapes to the seams.
10. Install the door frame. The frames can be directly wrapped on the board with plywood; fix it with wall by using nails, and then cover the surface with decorative plate.
11. Finish paint and wallpaper. No need to apply plaster on the installed wall, just apply putty directly, and then cover it with paint or wallpaper; if you need to paste tiles or marbles on the wall, no need to apply the putty, just paste cement mortar directly on the wall.
12. Install the door and furnishings. You can install the door right after the mounting of the door pocket. Install lighting, furniture, air conditioning and so on in the interior as you wish, which allows nailing and hanging.
13. Thank you for your trust and support. Congratulations to you on using the new environmentally-friendly energy-saving light partition wallboards, while making contributions to the national energy-saving cause. For other related technologies, please contact us. Our professional technical staff will be sincerely at your service.

Contact Us
Wallboard Sales Department :
Wallboard Sales Department :
Mob: Mr. LAI 13706796612
Mob: Mr. WU 13515799079
Paper Packaging Sales Department:
Tel: +86-0579-86090333 86092333
Mob: Mr. Li 13967983456
Mob: Mr. YI 13566772760